Hospital Development Plan

Services in active
development at RRSH

Infrastructure is in place across the hospital. These units are structurally ready and pending equipment or activation. Each represents an expansion of free public healthcare for the Amravati Division.

6
Units in pipeline
220
Operational beds
5
Districts served
In Development

Development pipeline

Infrastructure and staff are in place for each unit below. Activation is pending equipment procurement.

1
Cardiology

CVTS Unit Activation

The Cardio-Vascular Thoracic Surgery unit building and infrastructure on the Third Floor is structurally complete. A specialist team is in place. Instruments and equipment are pending to activate open-heart surgical capability.

Infrastructure ready — instruments awaited
2
Diagnostics

Blood Bank Equipment

A licensed blood bank facility on the Second Floor is structurally complete. Equipment activation will make this the only government blood bank in Amravati district.

14/66 items GR-sanctioned — 36-item CSR gap remaining (~₹2.16 Cr)
3
Radiology

AI PET-CT Scanner

DHS demand ₹37 Cr — not GR-sanctioned; full radiology block ₹134 Cr

DHS demand ₹37 Cr — not GR-sanctioned; full radiology block ₹134 Cr
4
Diagnostics

MRI Activation

MRI services are currently provided through an outsourced MOU arrangement. An on-site MRI unit is planned. Once operational, this will eliminate outward referrals for neurological and oncological imaging.

Near activation — final equipment pending
5
Rehabilitation

Physiotherapy Equipment

The Physiotherapy unit space is ready. Six key devices are needed to operationalise a full rehabilitation programme for post-surgical and neurological patients.

Space ready — 6 devices needed
6
Nephrology

Urology OT Laparoscope

The Urology OT is fully operational. A laparoscope is required to perform minimally invasive urological procedures. Currently, patients requiring laparoscopic urology are treated with open surgery or referred out.

OT operational — laparoscope absent
7
Cardiology

Second Cath Lab

The existing Cath Lab performed 1,901 angiographies in 2025-26. A second lab is planned to reduce wait times and expand capacity for cardiac interventions.

High demand — single lab at capacity